Public simulation


Simulation Icon

Building 2nd

Public
Status: Simulated (09-03-2021 10:48:06) Delete

Variable Value
Scalesingle building
Time horizon for the evaluation [years] 25
Supply[]
Objective of the optimizationmaximum NPV
Annual Discount Rate [%] 1
Net billing premium [€/kWh or auto]0.0
Maximum limit for the initial investment cost [€]none
Price of electricity bought from the grid [€/kWh] 0.1836
Price of electricity sold to the grid [€/kWh] 0.060
Module efficiency0.165
Module height (m)1.0
Module width (m)1.0
Cost of the finished PV system [€/kWp] 1500
Performance ratio of the system at STC 0.8
Linear annual efficiency losses of the PV system [%]0.75
Annual maintenance costs [€/kWp year] 7.5
Linear annual growth of price of electricity bought from the grid [%]1
Linear annual growth of price of electricity sold to the grid [%]0
Linear annual growth of the electric demand [%]1
Variable Value
PV capacity [kWp]2.31
PV area [m²]14.00
Expected Net Present Value [€]1758.87
Self-sufficiency [%] 25.58
Self-consumption [%] 83.47
Annual cumulative production [kWh]1790.92
Annual cumulative balance production/consumption0.32
PV system initial cost [€]3465.00
Expected payback time15 years 7 months 24 days
Expected LCOE considering self-consumed electricity [€/kWh]0.14
Expected LCOE considering the produced electricity [€/kWh]0.13
Specific emission of self-consumed electricity [kg CO2-eq/MWh]189.83
Specific emissions of the produced electricity [kg CO2-eq/MWh]168.22
File Download
Optimization reportem_report.pdf
Area available for PVPV_areas.obj
Area suggested for PVPV_layer.obj
Contextcontext.obj
Suggested PV configuration
Weather fileepwfile.epw
PV Production ProfileProductionProfile.csv
Electric Demand ProfileConsumptionProfile.csv